Case Study

Centralised Boiler Replacement

Centralised Boiler Replacement

Pages 1 Pages

‘’As the flagship headquarters of BP International we only had a relatively small window of opportunity to install the replacement centralised boiler unit. JCA completed a detailed feasibility study of the existing boiler installation and designed a low energy replacement system that met the strict programme requirements. JCA designed and monitored the works to an exceptionally high standard.’’ Mark Johnson, Head of Projects, CBRE Account Manager for BP International, UK www.jca.co.uk Following a detailed condition report and assessment of the existing and failing centralised boiler installation for BP International at their central London headquarters at 1 St James Square, JCA designed and specified a new replacement centralised boiler system with current fully modulating,