Case Study

Central Station Berlin Opening 2006

Central Station Berlin Opening 2006

Pages 4 Pages

grandMA Case Study grandMA – total control Central Station, Berlin © Ralph@Larmann.com– MA control network ensured an extremly safe show with a powerful backup solution Central Station Berlin Opening 2006 © Ralph@Larmann.com © Ralph@Larmann.com The decentralised placement of the NSPs offered the possibility to create “fresh” DMX signals at any location grandMA consoles were installed as backup on the two trains in case of a radio communication

Join for free to read