Central Ohio Warehouses
760 Long Road Crossing Dr. • Chesterfield MO 63005 800-899-1989 • www.cambridge-eng.com Operating Costs Based on 6,153 Heating Degree Days @ 65° $0.21/ft² Gas cost @ $1.00/therm $0.06/ft² Electric cost @ $0.08/kWh $0.27/ft² T otal cost Operating Costs Based on 6,153 Heating Degree Days @ 65° $0.16/ft² Gas cost @ $1.00/therm $0.01/ft² Electric cost @ $0.08/kWh $0.17/ft² T otal cost Building Specifications • 150,000 ft² x 2