Case Study

Central Fire Station - Cedar Rapids, Iowa

Central Fire Station - Cedar Rapids, Iowa

Pages 2 Pages

Merlot Full Range On June 13, 2008, flood waters crested in Cedar Rapids at 31.12 feet, 19.12 feet above flood stage, inundating the Central Fire Station with 11 feet of water. The building was declared a total loss. A new 67,140 square foot Central Fire Station was constructed with two-stories above grade and one below. It has eight apparatus bays, seven of which are drive-through. The first floor is occupied by the firefighters and conta

Join for free to read