Case Study

CENTER PARCS WOBURN FORREST

CENTER PARCS WOBURN FORREST

Pages 2 Pages

ECOCRIB CASE STUDY CENTER PARCS WOBURN FORREST LOCATION: Center Parcs, Woburn Forrest MAIN CONTRACTOR: Bowmer & Kirkland ARCHITECT: Holder Mathias STRUCTURAL ENGINEER: Peter Bre) Associates ECOCRIB SYSTEM: reinforced soil MAX. RETAINED HEIGHT: 8.8m FACE AREA: 1000 m2 PLASTIC WASTE DIVERTED FROM LANDFILL: 75 tonnes PROJECT IN BRIEF CASE STUDY PROJECT IN FULL CASE STUDY WWW.ECOCRIBWALL.CO.UK The Challenge In 2012 Bowmer & Kirkland (B&K) were awarded the £95M contract to build the 5th UK Center Parcs village in the heart of the Bedfordshire countryside. Integra- 6on and conserva6on of the surrounding forrest was a key strategy for the team of specialist consultants tasked with the design of 3 large mul6-purpose leisure complexes of over 40,000m2 in the 365 acre site. Peter B