Case Study

CBMM and IHM Stefanini: Reducing energy use with a standards-based approach to operations

CBMM and IHM Stefanini: Reducing energy use with a standards-based approach to operations

Pages 3 Pages

CBMM improved power curve management and energy efficiency while addressing manual process inefficiencies and safety concerns by deploying AVEVA PI System, Production Management, and InTouch HMI. AVEVA’s integrated solution standardized and automated electric arc furnace operations, resulting in a 5.5% energy reduction in one furnace and approximately US$140,000 saved annually across three furnaces. Additionally, cycle times decreased by about 7%, while overall safety and operational efficiency significantly improved, demonstrating AVEVA’s impact on sustainable metal production.

Join for free to read