Catenary Replacement
Catenary Replacement C1a and C2 - CDOT Norwalk, Connecticut This contract involved the installation of 209 catenary and down guy foundations, 36” to 54” diameter with depths ranging from 10’ to 25’ and includes drilling in soil and rock. All our work was done during limited work hours in an operating railroad environment including an overhead electrical catenary system with the majority of foundations installed using high-rail equipment