Case Study
Case: Put A Stop To High Running Costs
CASE: PUT A STOP TO HIGH RUNNING COSTS A Telecom operator created continuous savings with ROI in maximum 3 years - by adding to an existing air conditioning solution. Sometimes, all your cooling solution needs to be truly cost- effective is a complementary teammate. This was the conclusion, when a middle-east based Telecom operator wanted to discard their cost-intensive air conditioners in favor of more energy- efficient cooling. From air