Case Study

Cascade and Chinook Lifting Slings

Cascade and Chinook Lifting Slings

CASE STUDY Samson and SWOS work with Technip to develop a synthetic heavy lift sling solution to install subsea hardware for Petrobras CASCADE AND CHINOOK LIFTING SLINGS ProjECT ovErviEw Installing two pumping stations and two manifolds at Petrobras’s Cascade and Chinook fields in the Gulf of Mexico at depths in excess of 2,500 meters was accomplished with a “wet handshake” and the assistance of Samson’s AmSteel ® -Blue fabricated into

Join for free to read