Case Study
Carland Cross, Cornwall
CGL assisted Balfour Beatty Regional Civil Engineering with geotechnical and geoenvironmental input into the replacement of a number of wind turbines and construction of associated infrastructure on a site in Cornwall (Carland Cross, 6 miles north of Truro). Balfour Beatty consulted CGL to ensure the design specification was met relating to the construction of new access tracks, crane bases and turbine foundation backfill. A number of di