Case Study
Capital Solutions For London’s Waste
1 WWW.SITA.CO.UK THE CHALLENGE In 1992 the energy-from-waste (EfW) facility at Edmonton, which was built in 1970 and owned by the North London Waste Authority (NLWA), faced closure with substantial investment required for it to comply with new legislation. After reviewing its options, the Waste Authority decided to address this problem by seeking the involvement of the private sector. THE SOLUTION Selecting SITA UK from a number of interest