Case Study
CAMPING CASTELL MONTGRI, Girona, Spain - Install complete Daisy system
Case Study: CAMPING CASTELL MONTGRI, Girona, Spain Project ID: Company: CAMPING CASTELL MONTGRI www.camping-castellmontgri.com/es Location: Spain, Toroella de Montgri (Girona) Y ear: 2014 - 2015 ( hottest year in last 100 years) Description: Complete Daisy system Main pool (2.500 m 3 ) Goals: Reduction of chlorine demand, improvement of the water clarity , less combined chlorine Before After Combined chlorine (ppm) 0,58 0,05 - 0,1 Chlorine consumption per year 10.507 € tablets 200 gr 8.616 € NaOCl T urbidity (NTU) ? Clearer Problems: High chlorine consumption Actions: Result: Perfect water all the summer with high load of bathers Very low combined chlorine levels (0,05 to 0,1) The consumption of APF was probably double as necessary Small pool (390 m 3 ) Com