Case Study

Camp Porter Barracks Stabilization - Great Lakes, IL

Camp Porter Barracks Stabilization - Great Lakes, IL

Pages 2 Pages

Owner United States of America, Department of the Navy, Washington D.C. General Contractor Clark/Blinderman Camp Porter, LLC, Chicago, IL Engineer Graef, Anhalt, Schloemer, & Associates, Chicago, IL Project Summary Micropiles Underpinning and Lifting New Footings pair of concrete barracks structures were under construction at the Great Lakes Naval Base. The new buildings were designed on spread footings with a bearing capacity of 2.5 tons pe

Join for free to read