Case Study

Cambridge HTHV vs. Draw Thru Make-up Air: Large Retailer

Cambridge HTHV vs. Draw Thru Make-up Air: Large Retailer

760 Long Road Crossing Dr. • Chesterfield MO 63005 800-899-1989 • www.cambridge-eng.com Operating Costs Based on 5,545 Heating Degree Days @ 65° $0.27/ft² Gas cost @ $1.00/therm $0.02/ft² Electric cost @ $0.08/kWh $0.29/ft² T otal cost Operating Costs Based on 5,215 Heating Degree Days @ 65° $0.14/ft² Gas cost @ $1.00/therm $0.01/ft² Electric cost @ $0.08/kWh $0.15/ft² T otal cost Building Specifications • 1,291,950 ft²

Join for free to read