Case Study

CACT Offshore Platform Reduces Unplanned Downtime by Migrating from Legacy PLC System to Reliable CENTUM CS 3000

CACT Offshore Platform Reduces Unplanned Downtime by Migrating from Legacy PLC System to Reliable CENTUM CS 3000

Pages 3 Pages

Location: Order Date: Completion: Industry: http://www.yokogawa.com/suc/ SUCCESS STORY Hui Zhou, China March 2004 April 2006 OilÐGas Executive Summary The Hui Zhou 21-1A (HZ21-1A) offshore gas production platform has been operational since 1990. It is in the South China Sea, 130 km south of Shenzhen, China, and the water depth at this location is approximately 115 meters. The HZ21-1 gas field is operated by CACT Operators Group (CACT), a joint

Join for free to read