Case Study Power Factor Correction Cable Manufacturer Annual Savings Achieved ? £6,664.00 ? 44.69 Tons Co2 ? 33,793 kW/h site ? 83,221 kW/h inc transmission Payback ? 9.5 Months Benefits ? Removal of Reactive Power Charges ? Reduction of 206 Amps per phase ? of 148 kVa Demand ? Improved utility Permanoid are a cable manufacturer who were seeking to reduce carbon emissions and meet legislation in line with their CRC