Caban Coch

Caban Coch

Site Loca on: >> Caban Coch Client: >> DCWW Project Dura on: >> 6 Weeks Overview: During a rou ne inspec on carried out by the Dam Safety Team, a defect was iden ?ed with a pipe at the Victorian -built Caban Coch dam, in the heart of the Elan Valley, Mid Wales. The dam supplies 2.3 million people across Mid Wales, Hereford and Birmingham so is of major strategic importance. It was decided that one of the defec ve pipes could not be r