Case Study

C825 Maerdy Wind Farm

C825 Maerdy Wind Farm

Background: Blackwell was awarded the Full Balance of Plant contract to develop an 8 turbine wind farm at the head of the Rhondda Valley in Wales. The wind farm comprises of 8 "low environmental impact" Siemens SWT 3.0-101 direct drive turbines, with a total capacity of 24MW. The site is surrounded by forestry to the west, a disused quarry to the east, a ridge to

Join for free to read