Case Study
C812 Camps Crossing
Contract Summary: The Camps Crossing project involved the construction of a new single span 25m long heavy duty bridge to carry an operational access road from the Clyde North Wind Farm over Camps Water, linking the northern and central sections of the Clyde Wind Farm site. Extensive earthworks and temporary works were required to gain access along extreme terrain to the p