Case Study

By capitalizing on minimum vital flow, GEA Orengine increases the capacity of large hydroelectric plant by 2.5 MW, with the Rockwell Automation Integr

By capitalizing on minimum vital flow, GEA Orengine increases the capacity of large hydroelectric plant by 2.5 MW, with the Rockwell Automation Integr

By capitalizing on minimum vital flow, GEA Orengine increases the capacity of large hydroelectric plant by 2.5 MW, with the Rockwell Automation Integrated Architecture 100% sustainability within an easily replicable project that supplies enough supplementary electrical energy to cater for the needs of an entire village Background The hydroelectric plant is a 660 MW power station – located in the area of Medellín, Colombia – that harnesses th