Burghley Horse Trials

complete power solutions As far as power generation was concerned, the policy (prior to Off Grid Energy’s involvement) was to install a large generator that would run 24hours a day over the duration of the 5 day event. The 200kVA set that was specified consumes 46 litres of diesel per hour so using some 5,500 litres in total. Whilst the generator supplied several pavillions and a central feature, the steps taken to reduce energy consumption