Case Study

Building system BACnet Upgrade Enables High School To Centralize Control And Dramatically Reduce Energy Consumption

Building system BACnet Upgrade Enables High School To Centralize Control And Dramatically Reduce Energy Consumption

Pages 2 Pages

Irvington High School in Fremont, California, opened in 1961 with an enrollment of 1,450 students; today, the campus includes a 350-seat theater, two gymnasiums, two cafeterias, and 93 classrooms that host more than 2,000 students. Irvington is one of five high schools in the Fremont Unified School District, one of the largest school districts in San Francisco’s Bay Area. For years the high school students and faculty took formal measures t

Join for free to read