BUDE CANAL – CIVIL ENGINEERING

BUDE CANAL – CIVIL ENGINEERING

The walls were strengthened along the length of the harbour basin and underpinned with an anchored gunite apron where wave scour had undermined the masonry wall. JGP also conducted a survey to determine the volumes of accumulated silt that needed to be removed from the canal. Physical and chemical analyses of the silt enabled sustainable disposal of the silt on agricultural land and this delivered substantial nancial savings. John Grimes Part