Case Study

Brush Box Section

Brush Box Section

Pages 2 Pages

© 2009 PCT Engineered Systems LLC. All Rights Reserved Brush Box Section Tension Control Upgrades PCT’s scope of supply included a review of the tensioning components and processes. The outcome was a recommendation to increase the rewind tensions. The primary process tension deficiencies were found to be associated with inaccurate unwind tension control, poor tension isolation from the rewind section, and inadequate tension in the rewi

Join for free to read