Case Study
Bruce Power: Powering digital transformation with data-centric processes
Bruce Power reduced project timelines and costs by deploying an integrated suite of AVEVA solutions, including Asset Information Management, Point Cloud Manager, Unified Engineering, PI System, and CONNECT. These tools streamlined operations and improved efficiency by replacing outdated, document-centric processes. As a result, employees saved 1,000 hours in data retrieval, avoided 15% of repeat walkdowns and field checks, and achieved a 30% reduction in execution time due to enhanced design quality, driving significant operational improvements and cost savings.