Case Study

Browns Reservoir Dam

Browns Reservoir Dam

Standard Form 330 (6/1004) 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) RIZZO Associates (RIZZO) was retained by the First Taxing District, City of Norwalk, Connecticut, to prepare the Analysis, Design, and Construction Documents for the necessary improvements to the Browns Reservoir Dam a class “C” High-hazard Dam. The Dam was built between 1908 and 1910, to impound the Browns Reser

Join for free to read