Case Study

BROTIS Warehouse

BROTIS Warehouse

Pages 4 Pages

BROTIS WAREHOUSE Project Spotlight Globally Proven Construction Solutions BUILDING OWNER: BROTIS d.o.o. DISTRIBUTOR: BROTIS d.o.o. ARCHITECT: Dejan Kvesic CONTRACTOR: Plavi Servis d.o.o. LOCATION: Bosnia Herzegovina GENERAL CONTRACTOR: Inzinjering Jelah d.o.o.2 Challenges n Cold Temperatures - The main jobsite challenge was the low winter temperatures preceding and during the installation. Curing rates for cement-based materials are highly sensitive to both ambient and substrate temperature, with colder temperatures slowing setting times. n Tight Timeframe - The contractors leveling the floors needed to begin the preparation and installation process in as little time as possible to allow more time to cure. The team only had four days total to complete their portion of the B

Join for free to read