Case Study
Broadway Pier Cruise Terminal Port - San Diego, CA
http://wwwc-sgroup.com/louvers 800.631.7379 The historic Broadway Pier, constructed in 1919, has accommodated the U.S. Navy, the region’s fishing fleet, cruise ships and the royal yacht in 1983 visit by Queen Elizabeth. Since its recent renovation it is used as a cruise ship berth. It is also available for meetings, parties, conferences, performances or other public events. At other times public access is available, a portion of the pier is available 24 hours a day with another always accessible between sunrise and sunset. LEED Gold Certified the project was designed to be environmental friendly, accomplished using many methods. More than 93 percent of the construction debris was recycled. More than 20 percent of the total building materials contain recycled content. The buildi