Case Study

British Museum

British Museum

Pages 1 Pages

Working alongside Mace and the team that undertook the dismantling of TC2 tower crane used at the British Museum, Swantest were contracted to unload a series of pretension bolts. The work had to be undertaken over the weekend as a section of Montague Place had to be closed. One of the critical elements in the process was to ensure that the M56 and M48 pretension bolts which were holding down the crane were unloaded in time to allow the b