Brightpoint experienced extremely high utility bills and needed to update their equipment.

Brightpoint experienced extremely high utility bills and needed to update their equipment.

4790 West 73 rd Street I Indianapolis, Indiana 46268 Phone: 317-290-8500 I Fax: 317-290-1900 www.aesrack.com Project Identification Customer: Brightpoint – Ingram Micro Location: Plainfield, Indiana Design Specifications Facility Warehouse 556,000’ x 40’ High Winter Operation 70 ° – 0 ° Summer – 78 °-93 ° Case Study Report Air Energy Systems, Inc. Bill Maher bmaher@aesrack.com Project Challenge: Brightpoint was being heated by (4) 80/20 Engineer Air Direct Fired Recirculation Makeup Air Units and cooled during the summer with (22) 25 Ton Cooling Units. The air conditioning had to be distributed by the Makeup Air Units during the cooling season. Brightpoint experienced extremely high utility bills and needed to