Case Study

Brighton Bypass Bridges

Brighton Bypass Bridges

The ProjecT Client: DIER Value: $103M Completed: 2012 10 b IndustrIal d rIve PO b Ox 812 u lverst One tas 7315 PhOne : (03) 6425 6530 Fax : (03) 6425 6112 e maIl : InFO @vec .cOm .au www .vec .com .au ABN 42 067 541 879 Brighton Bypass Bridges Northern Section JV Midland Highway is a major transport link for Tasmania, and the Brighton Bypass aims to provide safe, high-speed travel for passenger and freight vehicles. Works involve: • 6.5 kilometre dual carriageway; • ten major structures; • 450,000 cubic metres of bulk earthworks; • 10,000 cubic metres of concrete; • 3,000 tonnes of reinforcing steel used in the construction of structures; • 1,000 tonnes of structural steel; • 170 super T beams; • a roundabout connection to the Midland Highway and interchange at Tea Tr