Case Study
Bridge Construction With Different Boom Sizes
BP 4158 GB Site report File under: A 1.00, BP 1.03, A 4.00, BP 4.03 Bridge construction with different boom sizes In Saxony-Anhalt on the outskirts of Lochau, the road bridge over the White Elster river is being complet- ely renewed. It will replace a pre- tensioned concrete construction from the days of the DDR and will guarantee the connection to Merseburg on the L183 highway. The 185 m long new construction is designed for significantly highe