Case Study

Bridge Abutment - WI Department of Trasportation

Bridge Abutment - WI Department of Trasportation

Pages 2 Pages

application Bridge Abutment location STH 40, WI product Mirafi ® HP770PET job owner WI Department of Trasportation engineer Bob Arndorfer, WI DOT – District 1 contractor Mattison Contractors, Knapp, WI date of installation November - May 2012 Protective & Outdoor Fabrics Aerospace Composites Armour Composites Geosynthetics Industrial Fabrics Synthetic Grass TenCate develops and produces materials that function to increase performance, reduce costs and deliver measurable results by working with our customers to provide advanced solutions. THE CHALLENGE In Chippewa County, WI, the existing bridge over Hay Creek was to be reconstructed. This was a first time project in the State of Wisconsin using FHWA EDC Initiative for a GRS-IBS project (Geosynthetic Reinforce

Join for free to read