Case Study

Bradway Tunnel Reinforcement

Bradway Tunnel Reinforcement

Pages 2 Pages

Case Study W E L D G R I P W E L D G R I P W E L D G R I P O C H L G T E N I E C A G O P H E R S D R I L L S T E E L S Pr oject: Client: Design & Build Main Contr actor: Pr oducts Used: Br adway T unnel Reinf or c ement ® W eldgrip Fibr egrip Rockbolts W eldgrip Fibr emesh Amalgamat ed Cons truction Co. Ltd. Railtr ackThe Bradway tunnel maint enanc e pr oject was part of the upgrading of Midland Main Line rail netw ork. The maintenanc e invol ved r eplacing a bulged ar ea of the brickwork lining in the r oof and sides. T o achiev e this a tempor ary support syst em was r equir ed to maint ain the integrity of the brickwork. ® W eldgrip Fibr egip Rockbolts wer e used to off er a saf e support syst em f or the brick tunnel lining, enabling cutting out and r eplac ement of the bulged brick

Join for free to read