Case Study

Bradkirk Bridge Blackpool, UK, 2010

Bradkirk Bridge Blackpool, UK, 2010

Pages 1 Pages

Bradkirk Bridge Blackpool, UK, 2010 www.gurit.com Case Study The new composite Bradkirk Bridge, featuring materials and technology supplied by Gurit UK, was installed in an impressive 6 hours in Blackpool, Lancashire during May 2010. The bridge replaced an existing metallic bridge that was life expired. The bridge was manufactured by AM Structures Ltd for Network Rail and engineered by WYG and comprises of two 12m spans and two flights o

Join for free to read