BP – Operation Canadian Crude

BP – Operation Canadian Crude

Pages 1 Pages

BP – Operation Canadian Crude – Whiting Refinery Modernization Project Whiting, Indiana Between February 2009 and April 2012, Case Foundation Company installed over 7,500 augercast piles at BP’s refinery in Whiting, IN. Augercast piles were 18” and 24” in diameter and ranged in depth from 80’-0” to 95’-0”. Design capacities were confirmed with Osterberg Load Testing. The entire project was performed within the active units of an