Case Study

Bouri Project Fuel Gas Treatment Package

Bouri Project Fuel Gas Treatment Package

Application The contract was placed by Mustang Engineering on behalf of the Libyan Mellitah Oil & Gas for the Bouri asset in Libya. The Fuel Gas Package was one of the last major systems to be purchased by the client and so there was limited space available on the platform. OGS had to design the package to fit into a footprint 7.2m (l) x 5.1m (w) with a height restriction of 3.6m. Description The scope of supply included: • 6” 300# LTCS, Fue

Join for free to read