The plant had bottle cleaning efficiency issues at its manufacturing facility. Downtime caused by insufficient water temperature was causing disruptions to the bottling operation. Before the solution, with the inconsistent hot water capacity, only 3,000 bottles were produced in a day. Consequently, efficiency went from 3,000 bottles per day to 5,000 generating a 67% increase in productivity. In addition, utility costs were climbing and approximately 21,120 gallons of water were wasted daily, costing the bottling plant and average of $6,720 per month. With the new CIRCOR solution, water waste was reduced, saving the bottling plant roughly $80,640 per year in water bills. The savings were enough to pay for the new equipment in just four months.