Case Study

Boston University

Boston University

Boston University Program Summary • Installation Cost: $359,697 • Total Utility Incentive: $97,140 • Annual Electricity Savings: 770,000 kWh • Simple Payback: 1.13 Years Energy Efficiency Measures • Lighting • Controls LIGHTING ENERGY EFFICIENCY TREATMENT Boston University’s track and tennis facilities underwent an LED lighting and advanced controls retrofit, designed and installed by ENGIE Services U.S. (ENGIE). THE PARTNERSHIP ENGIE and BU partnered together to improve lighting levels in the facility. The existing outdated ballasts also made a loud, noticeable sound in the building, which was especially a nuisance during commencement and recreational events. ENGIE helped BU design a modern lighting system with the ability to dim as well as have advanced capabilities for control. E

Join for free to read