Case Study
Boshporus highway
Boshporus highway Another major tunnel project, another job for Grindex pumps Once again Grindex pumps have been chosen to keep one of the world’s most advanced tunnelling projects dry. The Eurasi Tunnel, which will stretch 5.4 km and connect Europe and Asia in Istanbul, will take 55 months to complete. The Euroasia Tunnel Project is a 14.6 km route between Kazlicesme on the European side and Goztepe on the Asian side of Istanbul. It consists of three sections, widening and improvement of existing roads (including an extra lane) in Asia; construction of a two-deck road tunnel under the Bosphorus Staright; and widening and improvement of existing roads (including extra lanes) in Europe. When completed, the project will reduce the average travelling time between the two points from 100 minut