Case Study

Borough of Pen Argyl/Pen Argyl Municipal Authority Wastewater Treatment Facility

Borough of Pen Argyl/Pen Argyl Municipal Authority Wastewater Treatment Facility

Pages 2 Pages

PROJECT: Borough of Pen Argyl/Pen Argyl Municipal Authority Wastewater Treatment Facility Upgrade CHALLENGE: Maximize reuse / rehabilitation of existing tanks and buildings while allowing continual operation of treatment facilities during construction, and provide a process that would accommodate possible stricter discharge limitations. SOLUTION: ARRO designed an upgraded facility based on the Siemens Jet-Tech SBR process that would mee

Join for free to read