Case Study

BorgWarner Cooling Systems 4.3 % Increase in Productivity in 6 Months

BorgWarner Cooling Systems 4.3 % Increase in Productivity in 6 Months

Pages 4 Pages

At a Glance U.S. Automotive Supplier, BorgWarner optimized production at their German subsidiary, BorgWarner Cooling Systems, by utilizing FORCAM’s shop floor management technology: Factory Framework™. Overall production efficiency in the plant, with a total of 40 machines, increased by 4.3 percent within six months. The Company Name: BorgWarner Cooling Systems Branche: Automobile Supplier Headquarter: Auburne Hills (Michigan, USA) Turnover:

Join for free to read