Case Study
Bollfilter Automatic Ensure Prevention Of Fouling Retention Of Zebra Mussels At Raw Water Intake Of Power Plant
Bollfilter Automatic Ensure Prevention Of Fouling Retention Of Zebra Mussels At Raw Water Intake Of Power Plant
PROJECT CASE STUDY BOLLFILTER UK Limited Unit 9 Station Way UK-Tolleshunt D’arcy, Essex CM9 8TY Tel.: +44/(0)1621/862180 Fax: +44/(0)1621/869257 E-mail: sales@bollfilter.co.uk www.bollfilter.co.uk http://bit.ly/see-more-Case-Studies BOLLFILTER AUTOMATIC ENSURE PREVENTION OF FOULING RETENTION OF ZEBRA MUSSELS at raw water intake of power plant The power p