Case Study

BMW AG

BMW AG

BMW AG DINGOLFING Case Study To increase throughput and efficiency and to ensure avail- ability of stocks and equipment - these were the demands made by the pressing plant of the car manufacturer BMW in the Lower Bavarian town of Dingolfing when it opted for optimizing its internal logistics by so-called retrofitting, the modernization and renovation of existing system components. In its capacity as a general contractor, Aberle was awarded

Join for free to read