CASE Study SAyFA Systems uK Ltd meets head-on the challenges of installing safety hand-rail over live, high voltage, electric railway lines Birmingham GatewaythE SoL ution Planning and organisation were the key factors required for this very demanding installation. All tools were tethered during use and a full debris net installed. Work was carried out both during and outside normal working hours so that the job was completed on time to the high standard required. thE Situ Ation Sayfa Systems UK ltd was commissioned, to design, supply and install a galvanised safety handrail system, to a Network Rail specification, for an existing concrete roof as part of the re-development of Birmingham New Street Station. thE ChALLEnGE The works extended over several sections of high volt