Case Study
Biocair reduces transit times to China
Biocair reduces transit times to China Challenge Biocair were contacted by one of the UK’s leading Pharmaceutical companies to design and implement a cost e ective solution for the shipment of temperature sensitive R&D materials from Europe and the US to China within a 72hour turnaround time. Due to the time di erence, ight transit times and complex import procedure for this type of material in to China the initial industry wisdom was that it would not be possible. Solution Not perturbed by this, same day collections and routes to allow next ight out were identi ed in each case to maximise the time available for clearance once the shipment had arrived in to China. A cross functional global team within Biocair then determined and agreed a speci c process to facilitate the fast clearance r