Case Study

Bespoke Site Upgrade

Bespoke Site Upgrade

Project Case Study Overview Our client approached Darcy to provide a cost effective bespoke solution to ensure that the site was equipped to deal with fire water run-off in the event of a fire. Project Features The thinking behind the project was to ensure that the site was protected from the outside in. By utilising the drainage as a storage area, and installation of removable we ensured that with our systems installed, over 1m li

Join for free to read