Case Study
Bespoke Hydraulic Work Platform.
BESPOKE HYDRAULIC WORK PLATFORM. Claxton solution enables rigless pulling and running of conductors for a UK land well client. THE PROBLEM During a workover, a land-well client encountered cement higher than expected in the casing strings. The only solution was to drill out the cement and rerun the 10 3 /4" - and 7" casings. Budget constraints meant a rig was out of the question for the job, so Claxton was asked to design a system to pull and r