Case Study
Benguela Belize: Angola
Highlights Designated as “Project of the Year” for • 2005 by the Offshore Energy Association The first compliant pile tower (CPT) • installed outside the Gulf of Mexico Produces a rate of 220,000 barrels of oil • per day Largest offshore topsides facility • fabricated in a 24-month time frame For more information contact KBR at 713.753.2000 or www.kbr.com Benguela Belize Angola OTC “Project of the Year” Award Winner Client - ChevronTexaco/DSM