Bengalla Coal Project

Bengalla Coal Project

Pages 1 Pages

Create Build Operate Included in the original project was the installation of a 4.2 km long curve conventional overland conveyor (OLC). Continuing our successful long-term relationship with Bengalla Mining Company, we upgraded the raw coal handling plant including ROM hopper in 2009. In 2011, as part of the Thiess Sedgman Joint Venture, we increased the feed rate to 1,700 t/h and improved operational flexibility by converting the processing